Saturday 26 May 2012

Summary of work to 27th May

This week at 14-10 hrs Thursday, Dave finished the drip strip over the side doors which completed the steelwork contract and we will now both work full time on the fit out.
There are still some minor steelwork extras like the lamp mast and some roof box work to be done as part of the fit out but the steelwork is substantially complete.
It looks excellent and I am pleased with it.


As of Friday evening we have the 12V wiring looms for each side loosely in place and the boarding out of the cabin continues.
The hull side (gunnel to floor) boarding has been carried through the back cabin on the starboard side and Dave has made start on the roof boarding.

No comments:

Post a Comment