Saturday, 12 May 2012

Panelling the hull sides




This shows how the T and G  planks form the hull side panels spanning the floor batten to the underside of the gunnel.


Panelling the port hull side from the engine room to the saloon front took just over a day.
A pull through wire has been installed to allow easy installation of the toilet wiring and the cut out for the galley sink pipe can be seen beyond.
The area behind the stove has been missed as this will be covered by fireboard and tiles.




No comments:

Post a Comment