Saturday, 19 May 2012

Summary of work to 18th May

Another productive week following the usual format of Dave getting me started on the interior fitting out tasks whilst he mainly concentrated on the steelwork which is very close to completion.
Completion of the bow steelwork (except T stud installation) has really brought the character of the shell to life. The work put into the deck lids, hinges and stem iron etc shows attention to detail and craftsmanship which easily justifies the cost.
On Friday night when we "knocked off" the area was strewn with tools etc and the light was bad but I shall take and add some photos as soon as possible.

No comments:

Post a Comment