Wednesday, 16 November 2011

Roof details

These frames are the coaming for the 3 pigeon boxes which will be installed over the engine room, galley and saloon. At this stage they are flat.
This photo shows the engine room removable hatch bolted in place. One of the coamings in the first photo will be welded over cut out.

Just forward of the cabin roof rings and over the bathroom, the cut outs for the mushroom vent and the two  prisms which will light the bathroom are shown.

No comments:

Post a Comment