Sunday, 28 October 2012

Summary of work to 26th October

Back cabin graining and decoration by Ian Kemp is well under way.

Dave has continued his joinery with the boxing in of pipes and water pump plus construction of the  saloon corner unit completed.
(As usual all this was then pretty near dismantled for finishing so some photos are a bit thin on the ground this week.)

I have been mainly doing the finishing work on the above and varnishing Ian's graining.

Next week we should complete the galley joinery with shelves against the front bulkhead revised to give a slight dresser style.
I will be tiling the galley and doing as much of the outstanding painting as possible.