Saturday, 30 June 2012

Summary of work to 29th June

The boarding / panelling out has continued with the doors, roof lights and prism surrounds being carried out at the same time. As Dave has completed his joinery work I have continued to follow as soon as possible behind with the beading, filling and finishing etc.
The photos this week were taken early and progress was further than actually shown.

The doors have also been drilled to mount the door liners using screws from the outside of the boat which will be countersunk , prepared by shotblasting then covered in epoxy filler during the final paint job.