Saturday, 3 November 2012
Summary of work to 2nd November
As will be seen from the posts below the fit out is nearing completion.
For the time being, Dave has now gone over to work on another project conveniently alongside mine, and I will continue with the internal decoration and electrical connection etc.
He will drop back onto Primus when required.
The fit out to date has taken just under 900 hours of Dave's time.
I estimate I have probably done something similar.
This is in line with Dave's original estimate based on his previous projects.
Costs are also in line with our original expectations.
Matching beer glasses!
Not many boats have name matched beer glasses but Primus does.
Thanks are due to Jim Evans (nb Gazelle) currently working in Brussels who is a valued customer (!) of a bar selling Primus Belgian beer and especially to Rachel the barmaid for a set of glasses and beermats.
Bathroom
nb. The gap below the bath edge is because the bath has been temporarily lifted onto small blocks to allow the edge of the woodwork below to be properly sealed with paint before the bath is once agin dropped into place on sealent. This will protect against the wetting of the woodwork.

The bathroom now has its first coat of decorative paint.
This colour is "James" eggshell, another heritage colour from the Little and Green range.
Galley- shelves, tiling, doors and drawers added
Shelves have been added at the bulkhead end of each worktop. When a fiddle rail is fitted this gives a welsh dresser type of look and, being against the bulkhead, creates storage or display space efficiently with minmal intrusion into the galley.
The splashback has been created using these brightly coloured ceramic tiles.
The colours were chosen to provide an accent to the more restrained colours in the saloon and galley
This was a pretty easy job as the tiles were uniformally square and fitted on a flat plywood surface.
The doors have been hung and catches fitted. Knobs will be fitted next week.
The drawers are in place with handles fitted.
Sunday, 28 October 2012
Summary of work to 26th October
Back cabin graining and decoration by Ian Kemp is well under way.
Dave has continued his joinery with the boxing in of pipes and water pump plus construction of the saloon corner unit completed.
(As usual all this was then pretty near dismantled for finishing so some photos are a bit thin on the ground this week.)
I have been mainly doing the finishing work on the above and varnishing Ian's graining.
Next week we should complete the galley joinery with shelves against the front bulkhead revised to give a slight dresser style.
I will be tiling the galley and doing as much of the outstanding painting as possible.
Dave has continued his joinery with the boxing in of pipes and water pump plus construction of the saloon corner unit completed.
(As usual all this was then pretty near dismantled for finishing so some photos are a bit thin on the ground this week.)
I have been mainly doing the finishing work on the above and varnishing Ian's graining.
Next week we should complete the galley joinery with shelves against the front bulkhead revised to give a slight dresser style.
I will be tiling the galley and doing as much of the outstanding painting as possible.
Saturday, 27 October 2012
Stern doors - decoration in progress
The stern doors and starboard side panel each have roses and castles decoration.
This shows Ian's work at an early stage.
This shows Ian's work at an early stage.
Table cupboard, knife drawer and ticket drawer
Ian is in the process of decorating the back cabin in traditional fashion. The photos below show the table cupboard, knife drawer and ticket drawer.
Note that although this looks pretty good already that it is not yet complete.
Note that although this looks pretty good already that it is not yet complete.
Subscribe to:
Posts (Atom)