Summary of work to 27th July

This week the electrics have been connected to the 12V and 240V panels in the engine room and the heavy current wiring of the batteries, engine and alternator. This was carried out by the electrician from Loom-tech.

Dave has continued building the back cabin which is now close to completion.
I have, as usual, done lots of small tidying up jobs and filled and painted which doesn't look much but regularly keeps me busy till after 10 pm.

The saloon stove is now bolted down on it's hearth awaiting the installation of the insulated flue and roof collar etc which will be carried out next week.
Also scheduled for next week are starting the engine commissioning and the plumbing.