Thursday 30 June 2011

Hull guards fitted and bow nearing completion





Detail of the stem iron laminated from 3  20x65mm strips the top being D section.
When the breast block is added the stem iron will be bent down and tapered into it.
In plan it will be flared out into a fish tail and nail detail will be added.




The front deck will start where the mug is standing on the gunnel.






No comments:

Post a Comment