Sunday 30 September 2012

Summary of work to 28th Septemeber

With the boat back at the yard Dave has got on well with construction of the bedroom.
I have fitted the lighting and gloss painted the insides of the galley cupboards and the back cabin.

The water rail on the engine was found to be leaking on a porous weld so has been removed and returned to Walsh's for repair.

No comments:

Post a Comment