Saturday, 8 December 2012

CONTINUATION OF THE BLOG

›
Please click on the link below to go to part 2: http://www.canalworld.net/forums/index.php?app=blog&module=display&section=blog...
Saturday, 24 November 2012

Summary of work to 23 November

›
This week the gas system and cooker have been connected up and tested. I have painted the following: Galley and saloon cabin sides final...
1 comment:
Sunday, 18 November 2012

Summary of work to16th November

›
This week I  spent three days getting 2 more coats of varnish on the graining and decoration in the engine room and back cabin. I also spen...

Walsh's Engineering - Generous warranty work.

›
During the trip to shotblasting a couple of water leaks on the engine were noticed. These were from a weld on the "water rail...
Saturday, 10 November 2012

Summary of work to 9th November.

›
Ian Kemp has completed his decoration of the back cabin and engine room. I have managed to complete the first coat of yacht varnish on all ...

Kabola C/H and domestic hot water

›
The Kabola boiler for the central heating and domestic hot water has now been commissioned and after a few glitches the system is working we...
1 comment:

Engine room step/storage

›
At the port/stern end of the engine room Dave has built this step with storage underneath. It was made from offcuts of the oak flooring wit...
›